Season 7 Breakdown
Normal Episodes: 25
TV Specials: 0
TV Movies: 0
Normal Episodes: 25
TV Specials: 0
TV Movies: 0
This Old House Hour Season 7 (2008-2009)
![]() | 7x01 Episode 1 Season 7 begins with a new project: building an eco-friendly barn like house for a couple who out used their 1970's styled home. The materials will be reused from the 1970's home as ... | Oct. 02, 2008 |
![]() | 7x02 Episode 2 The old home is torn down as construction begins on the new one, with the main frame being built from the Douglas fir derricks. Also included is how to replant a mature tree and how ... | Oct. 09, 2008 |
![]() | 7x03 Episode 3 The guys work on getting the precast walls in place, pouring the cement for the basement and garage floor, and a insulating, in-slab radiant heating system is installed, a yad plan ... | Oct. 16, 2008 |
![]() | 7x04 Episode 4 The crew works on a prefabricated interior along with exterior wall systems. The dining area is framed with salvaged timbers, and the building is pre-wired. Also, how to repair a lawn ... | Oct. 23, 2008 |
![]() | 7x05 Episode 5 The crew cranes in and set the walls for the mechanical-room module and basement level. Also, the floor panels are fabricated; the floor systems are installed; and the basement level ... | Oct. 30, 2008 |
![]() | 7x06 Episode 6 This episode features the raising of the first floor timbers and the exterior walls are put into place. Then, a look at the kitchen area and how the custom fabrication is to be done. ... | Nov. 06, 2008 |
![]() | 7x07 Episode 7 The first and second floors are toured; a discussion of how the water supply and drainage pipes to the back to back bathrooms will be assembled; plans for the landscaping; plus a dedication ... | Nov. 13, 2008 |
![]() | 7x08 Episode 8 The final roof panels are placed; also the shingles and standing seam copper roof are fastened to the cupola and the windows are flashed; Also, a waterproofing and shower enclosure ... | Nov. 20, 2008 |
![]() | 7x09 Episode 9 On this episode we will see the addition of the exterior stone veneer; the synthetic roofing materials; a custom wainscoting chair rail; and the garage doors. Plus, a retaining wall ... | Nov. 27, 2008 |
![]() | 7x10 Episode 10 This episode features the addition of a solar water heater, which makes use of evacuated tube technology. Also, an overview of all the completed work, which includes the rough plumbing, ... | Dec. 04, 2008 |
![]() | 7x11 Episode 11 Work at the Weston house includes the installation of 18 solar panels, copper gutters and decorative brackets are applied to the street side. Also, a showcase of a prefabricated Habitat ... | Dec. 11, 2008 |
![]() | 7x12 Episode 12 This episode features the addition of granite steps to the entry porch, the pergola's precast footings and Goshen stone is added to the front patio. Also, the rough sawed, reclaimed ... | Dec. 18, 2008 |
![]() | 7x13 Episode 13 In this episode the underground tank for rainwater is added; the back porch has a hidden deck fastening installed for the composite decking; reclaimed galvanized metal is used on an ... | Dec. 25, 2008 |
![]() | 7x14 Episode 14 In this episode, a berm and fence are installed in the front yard of the Weston project home as a means of shielding the front yard; a look at the plants chosen for the planting beds; ... | Jan. 08, 2009 |
![]() | 7x15 Episode 15 This episode features the completion on the Weston house. Projects include the landscaping, granite hearthstone is installed for a fireplace, and a viewing of the media room which has ... | Jan. 15, 2009 |
![]() | 7x16 Episode 16 A new project begins in Brooklyn, where a 1904 rooming house is transformed into a three family home. Includes a similar project on the same street; the beginning of demolition work; ... | Jan. 22, 2009 |
![]() | 7x17 Episode 17 As the brownstone renovation continues, we get an update on the framing, options regarding the heating system, a visit to Brooklyn's Prospect Park, and a TriBeCa rooftop garden. Also, ... | Jan. 29, 2009 |
![]() | 7x18 Episode 18 This episode features the continuing work on the Brooklyn brownstone, including its conversion of hot water heaters from steam radiators, taking assessment of the wood finishes and ... | Feb. 05, 2009 |
![]() | 7x19 Episode 19 Work at the Brooklyn brownstone continues as the inspectors examine the paint job. White oak flooring is added to the parlor floor with two cherry accent strips are added as a decorative ... | Feb. 12, 2009 |
![]() | 7x20 Episode 20 Construction continues from the Brooklyn brownstone as inspections are conducted on the carpentry work, flooring and new shower in the master bath. Also, the first floor color scheme ... | Feb. 19, 2009 |
![]() | 7x21 Episode 21 Work continues on the Brooklyn brownstone with the installation of a spiral staircase and a plaster medallion. Next the project moves on to it's rental units, as one receives linoleum ... | Feb. 26, 2009 |
![]() | 7x22 Episode 22 [add summary] | Mar. 05, 2009 |
![]() | 7x23 Episode 23 Interior door trim is added to the library area of the Brooklyn brownstone, and countertops are added inside the kitchen. Also, the electrical, plumbing and heating services are added ... | Mar. 12, 2009 |
![]() | 7x24 Episode 24 Work continues on the Brooklyn brownstone with the re-installation of the white oak entry doors. In the kitchen, both the appliances and sink are connected and a pot filler is placed ... | Mar. 19, 2009 |
![]() | 7x25 Episode 25 The season 7 finale finds the Brooklyn brownstone project being completed, which includes the laying of sod and the installation of spindles at the base of the main staircase. Also, ... | Mar. 26, 2009 |
« previous1next »
Season 7 Characters[none added] |
Season 7 Videos[none added] |
Season 7 Trivia[none added] |
|
» Back to This Old House Hour Wiki

